THE OVERLAKE MATH AND SCIENCE BUILDING

by | Jan 4, 2022

Redmond, WA

 

 

 

 

 

NuRay Metal 2200

 

 

 

 

 

 

GenFlex TPO

 

 

 

 

 

 

 

 

 

 

 

 

CalArc Pavers/Bison Pedestals

 

 

 

 

 

 

Columbia Green 5" Plant in Place

 

 

 

 

 

 

The Overlake School was a new construction project of a Math and Sciences building in Redmond, Washington. 
General Contractor: Seacon
Architect: Mithun
Duration: Eight Months 
Scope of Work: Element Smart Roofing performed for the following items.

  • R-38 rigid insulation with Nail base nailer on pitched roof.
  • Self Adhered High Temp Ice and Water  (Carlisle WIP 300 HT) on pitched roof.
  • NuRay NRM 2200 Mechanical Seam Panels on pitched roof
  • SnoGem Snow Cleats on Metal Roof
  • Custom 6″ Box Gutters with Custom 22g Support Wedge
  • Custom Metal Diverter Flashings
  • V-Force Vapor Barrier on Flat Roof Deck
  • R-38 Rigid Insulation Assembly-Fully Adhered
  • 1/4″ Tapered Insulation assembly-Fully Adhered
  • 1/2″ DensDeck Cover Board-Fully Adhered
  • GenFlex EZ 60 mil TPO-Fully Adhered
  • 20 mil PVC Root Barrier-for Green Roof
  • 5″ Columbia Green Technologies Plant in Place Green Roof system-2 Areas
  • 2 Zone Irrigation system for both Green roof Areas
  • StepStone CalArc Sandblasted slurry Concrete Pavers on Bison adjustable Pedestals over TPO roof on Lower Deck
  • Custom TPO Through Wall Scuppers with Collector Heads and 3″ Round Downspouts
  • 20 Year NDL Warranty from GenFlex/Firestone
  • 35 YR Paint warranty from NuRay Metals
  • 5 YR Green Roof Warranty from Columbia Green Technologies
  • 2 YR General Labor Warranty for entire projecct.

This project was a big challenge for our company as it involved multiple work scopes and materials.  As with any project it had its challenges at several levels, from design to construction, but the project also had weather issues and was in process as the Covid-19 pandemic first broke out.  When roofers were declared ‘essential workers’ it allowed us to keep moving forward on our work scope, provided we followed the new CDC guidelines for Covid-19.

In spite of a global pandemic and some bad weather moments, we were able to complete all the work scopes on time (timelines were extended due to these extenuating circumstances).  This was probably the most challenging commercial project we have done…EVER. We feel it came out great.

Category: Category 3

Recent Projects

SAARS MARKET OAK HARBOR

.Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not...

CRANE AT INTERBAY

..The Crane at Interbay was a six level new construction residential building in Seattle, Washington.  This roofing project was with completed with TPO and LiveRoof. General Contractor: Graham Construction & Engineering IncDuration: Four MonthsScope of...

ATHENE

Athene was a new construction six story building project for a Senior Living Community in the Totem Lake neighborhood of Kirkland, Washington. General: Venture GeneralArchitect: Ankrom MoisanDuration: 6 monthsScope of Work: Element Smart Roofing completed the...

GLOBE MACHINE

Globe Machine Manufacturing was a Metal retrofit and Roof Recovery System project of a large warehouse facility in Tacoma, Washington.   We installed metal roof retrofit to PVC. The flat roof was recovered with Duro-Last PVC over the existing roof material. The Metal...

Paste your AdWords Remarketing code here